K313 Underground Mining Drill Rigs and Tunneling Jumbo is applicable for tunneling of hard rock mines with a section of 12-35 sq. m., designed exclusively for concurrent anchor bolt driving, capable of drilling a 2.2m-deep anchor rod hole in a 4m-high roadway.
Its firm and reliable universal big arm has the best shape of section coverage, boosting the 360° overturn and automatic leveling of the beam for rapid and convenient borehole positioning. The big arm can also be used for lateral cross hole opening and anchor rod boring operations.
The arrangement of the jumbo ensures the good view of the operator.
Evenly-arranged and powerful 4-wheel drive hinge chassis ensures flexible, quick and safe driving in a narrow roadway.
The high-frequency percussion rock driller uses the cascaded piston to optimize the efficiency of shock wave transmission, raise the drilling speed, reduce clamping bit consumption and enhance the soundness of device.
The big space of operation and a series of automatic functions can help the driver to concentrate their attention to safe, rapid and accurate tunneling.
All its repair and maintenance parts have been protected well, and its repair and maintenance are easy.
Technical Parameters of KJ313 Underground Mining Drill Rigs and Tunneling Jumbo
Dimensions versus Weight |
||
Length |
11300mm |
|
Width |
1750mm |
|
Height |
2000/3000 mm |
|
Weight |
12000 kg |
|
Travelling speed, level |
10 km/h |
|
Climbing capacity |
0.25 |
|
Security |
||
Noise level |
<100 dB(A) |
|
Lifting safety ceiling |
It conforms to the requirement to prevent rolling and falling rock. |
|
Drilling system |
||
Rock drilling |
1×HC50/R38 |
1×HC109/R38 |
Impact power |
13kW |
18.8kW |
Impact flow |
105L/min |
135L/min |
Impact pressure |
130bar |
135bar |
Maximum rotation pressure |
150bar |
150bar |
Frequency |
62 Hz |
47 Hz |
Torque |
325Nm |
780Nm |
Aperture |
32-89mm |
45-102mm |
Rolling of the propelling beam |
360° |
|
Compensative travel of propelling beam |
900mm |
|
Boom |
||
Model |
K26F |
|
Form |
Automatic leveling |
|
Extension of drill boom |
1200mm |
|
Electric Hydraulic pump station |
||
Electric motor |
45kW/55kW Three phase |
|
Impact- propelling-Boom |
Variable axial piston pump |
|
Turn around |
Gear pumps |
|
Filter precision |
10μ |
|
Hydraulic oil tank |
240L |
|
Hydraulic cooler |
Water cooler |
|
Working pressure |
380V |
|
Frequency |
50Hz |
|
Starting method |
Star - triangle |
|
Cable reel |
1×K440 |
|
Cable capacity of the reel |
100m/80m |
|
Outer diameter of cable |
Φ28mm/Φ32mm |
|
Specifications of cable |
3×35+3G6+2×1.5 |
|
|
3×50+3G6+2×1.5 |
|
Wind and water route system |
||
Air Compressor |
1×JN5 |
|
Capacity |
0.5m3/min |
|
Pressure |
5-7bar |
|
Lubricating device of drill rod tail |
Pressure oil lubricating oil tank |
|
Gas consumption for lubrication |
0.3m3/min |
|
Oil consumption for lubrication |
180-250g/h |
|
Pump |
1×CR3 |
|
Power |
1.5kW |
|
Pump Capacity |
3m3/h |
|
Chassis |
||
Diesel |
BF4L2011 53kW,2800rpm |
|
Tail gas clean-up |
Tail gas catalyst |
|
Transmission |
Closed-wheel drive traveling system |
|
Swinging angle |
The rear axle swings for ±10° |
|
Tire |
11.00-20 |
|
Steering mechanism |
±40° articulated steering |
|
Travel brake |
Double loop hydraulic brake |
|
Parking brake |
Multi-disk wet brake for reducer |
|
Fuel tank |
60L |
Overall Dimension (including an optional auxiliary power station)
Change Sketch